Final JV Month End
This page may contain multiple incoming links - Please use your browser back button to return to the previous page.
Watch our One Step Month End Quick Byte!
Introduction
The Single Step methods consist of two processes the JIBU114 Calculate Net and the JIBU115 Final JV Month End.
The Calculate Net JIBU114 can be run anytime during the month. The final joint venture month end is run at the end of the month to create the joint interest billings
Final JV Month End
This month end process completes the Gross to Net Cycle by running the following processes at month end:
1. JIBU087 – Generate Allocations Process
2. GELU011 – Posting of JIBU087 voucher
3. JIBU050 – Validation DOI Distributions
4. JIBU018 – Distribute to DOI Partners
5. JIBU077 – Generate Overhead – Operating Overhead
6. GELU011 – Posting of JIBU077 voucher
7. JIBU077 – Generate Overhead – Capital Overhead
8. GELU011 – Posting of JIBU077 voucher
9. JIBU050 – Validation DOI Distributions
10. JIBU018 – Distribute to DOI Partners
11. JIBU024 – Generate JIB Vouchers
12. GELU011 – Posting of JIBU024 voucher
13. JIBU066 - Generate GST Recovery
14. GELU011 – Posting of JIBU066 voucher
Run the JIBU115 Process
To run the process navigating to the main menu and select Joint Interest Processing → Final JV Month End.
Enter data to submit the final JV month end process.
This process is run for a single organization at a time. If you are running this process, you should also ensure that:
The Allocation Summary report (Optix → Masters → Joint Interest → Allocation Summary) is run before JIBU115 Final JV Month End.
The report should be checked to ensure that the existing allocations structure contains no errors (such as looping, for example).
Should the JIBU087 Generate Allocation process (called by JIBU115 Final JV Month End) encounter an allocation loop, it will hang and require that you end the JIBU087 and JIBU115 jobs.
A valid printer has been specified in User Defaults.
The voucher type(s) assigned to JIBU087 Generate Allocations, JIBU077 Generate Overhead, JIBU024 Generate JIB Vouchers, and JIBU066 Generate GST Recovery in Modules have been set up for auto numbering for the organization being processed.
The Accounting Period specified on the screen is open for the Organization being processed.
A Trial Balance report should be run afterward to ensure that all gross accounts have cleared.
JIBU115 Final JV Month End can be set up to run nightly using the Process Streams functionality.
Copyright© 2024 IFS AB. Copying prohibited. All rights reserved.