/
Maintain Production History

Maintain Production History

Search the Qbyte Metrix Wiki
 

Back to Work Management Control

 

Preload Production History

Production History is always loaded during Month End Close processing.  If you require earlier reporting for a Region, a Pre-Load Production History can be submitted from the menu option.  This job will load all Production History for a production date and region.

Recalc Production History

Generate Production History File




Copyright© 2024 IFS AB. Copying prohibited. All rights reserved.